Has served the southwest with high quality steel buildings metal buildings metal roofing and components for over a quarter of a century.
Pre engineered metal building roof overhang.
Roof overhangs can add to the value and usefulness of a building in several ways.
Mueller has branch locations in texas new mexico oklahoma and louisiana.
This project was a 16 000 sq.
Roof seamer a machine that crimps or folds adjacent edges of standing seam metal roof panels together to form a seam.
For longer slopes and lower roof pitches contact fabral for other suitable profiles.
You can also dress up metal buildings by adding eave overhangs or canopies.
This method is less wind resistant and in literature is limited to a 12 overhang.
Roof overhang a roof extension beyond the end wall or side wall of a building.
Single slope building creating a gable roof line.
Although many people want to.
The pbr panel is the industry recognized r panel with a purlin bearing leg.
Refer to the rain carrying table in this booklet for the maximum allowable panel length per slope that will provide adequate drainage.
Single slope addition to an existing 16 000 sq.
Roofline extensions add flair to pre engineered metal buildings.
Appearance extending the roof breaks up the boxy look of rectangular buildings.
Refer to the rain carrying table in this booklet for the maximum allowable panel length per slope that will provide adequate drainage.
Roof slope the tangent of the angle that a roof surface makes with the horizontal usually expressed in units of.
Roof pitch the metal roofing panels shown in this manual require a mini mum slope of 2 per foot to ensure proper drainage.
The pbr panel provides a full 36 inch coverage and has a ul90 wind uplift rating.
Ceco building systems designs fabricates and supports metal buildings combining custom technology with attention to detail and a high value on the customer relationships we build.
For longer slopes and lower roof pitches contact fabral for other suitable profiles.
If the gable overhang is to resist wind loads properly it must either be designed or constructed in accordance with some pre engineered prescriptive detail.
In addition to the panel rib wall system rock wainscot was used on the exterior of the building.
Ceco is the brand chosen by builders throughout the u s.
Figure 5 ladder outlooker block method gable end overhang.
The purlin bearing leg like the dr panel provides for a neat clean lap.
In part one of this series on steel buildings we discussed changing the roof pitch and gable rooflines versus hip rooflines.