The document has moved here.
Polypipe guttering fitting instructions.
Connecting gutters to downpipes floplast gutter compatibility chart pvc gutter installation pdf guttering what goes where jargon explained how to make a swan neck for standard guttering installing a water butt pvc guttering installation video how to fit floplast gutterbrush how to repair a leaking gutter joint gutter system compatibility.
Fig 1 cut out the hole for the outlet by carefully using a hole cutter.
This technical installation guide covers above and below ground systems and is produced in an easy to follow logical format.
Preparation of gutter 1.
Mark where on the guttering the outlet is to be fitted.
Gutter must be squarely cut and all burrs removed polypipe recommend the use of a fine toothed handsaw.
Where possible notched gutter should be cut at the mid point of the notch as indicated by the mark.
Using a straight edge join the marks to create a vertical line that shows where the centre of the downpipe will be.
How to fit a downpipe.
Constructed as a single piece moulded unit with an integrated ring lock seal polysoil pipe fittings have been engineered for quick simple fit and forget installation.
Polypipe building products in recent years has also innovated with its unique notched ogee gutter system which stops gutters becoming dislodged through heat expansion and contraction.
Fitting your gutter fitting half round gutter fitting ogee and box gutterfitting ogee and box gutter if you have purchased a running outlet skip to further instructions below.
Polypipe building products polypipe building products offer a comprehensive range of above and below ground drainage products plastic plumbing and underßoor heating systems for the residential market.
Polypipe domestic rainwater ranges are supported by our vast range of adaptors which allow our rainwater systems to be connected to nearly all types of existing installations including cast iron.
Extra care must be taken in damp conditions due to the slippery nature of the gutter surface.
Using a plumb bob that hangs from the outlet to the drain as a guideline draw several marks onto the wall to show where the downpipe will run.